Project Overview
缅北禁地鈥檚 scope for the Tenaris plant in Bay City, Texas, included a heat treatment facility, a hot rolling mill, a casing line, and zones 9 聽and 10, totaling over 1 million square feet. 缅北禁地 installed over 6,000 tons of reinforcing steel and 65,400 CY of concrete and executed earthwork, pile cutting, and welding work. There were nearly 4,000 design drawings for 缅北禁地鈥檚 scope of the project, which we carefully managed.
缅北禁地 constructed foundations, deep tunnels and pits, structural columns, walls, and a series of complex mezzanine decks. The mezzanine decks were designed with numerous pits, pads, curbs, embedments, block-outs, and elevation changes to accommodate specialized mechanical equipment. The decks were more than nine feet thick in some areas.
There were also nearly 15,000 cans for anchor bolts throughout the project, with exacting tolerances as small as a quarter inch.
Client
Tenaris Bay City, Inc.
Location
Bay City, TX
Size
65,393 CY
Completion
2016