National Enrichment Facility

Industrial | Clean Power, Energy

Industrial

Clean Power, Energy

Return

Project Overview

缅北禁地’s scope included building layout and dimensional control, excavation and backfill of footings, placement of Control Low Slump Material as backfill, procurement and installation of reinforcing materials, installation of anchor bolts and embeds (procured by others), procurement and installation of water-stop components, erection and dismantlement of gang wall formwork systems, hoisting and erection via 缅北禁地 furnished tower crane, and placement of all concrete. Also included as a part of our scope was procurement and installation of the electrical systems, HVAC systems, compressed air system, nitrogen system, life safety systems (fire alarm, fire suppression, smoke detections) architectural systems, building envelope, and site utilities. The UBC storage pad which included crane foundations, crane rails, and storage slab was also performed by 缅北禁地.

All projects include:聽Bunker,聽SBM 1001X,聽SBM 1003/1004,聽SBM 1005/1006,聽Multiple UBC Pads

This work was performed under NQA-1 standards. 缅北禁地 provided QA/QC and Safety oversight and management.

Client

URENCO USA

Location

Eunice, NM

Size

75,000 cy

Completion

2015